Telegram中文群组索引www.tel8.vip)是一个Telegram群组分享平台,Telegram中文群组索引包括Telegram中文群组索引、Telegram群组索引、Telegram群组导航、新加坡Telegram群组、Telegram中文群组、Telegram群组(其他)、Telegram 美国 群组、Telegram群组爬虫、电报群 科学上网、小飞机 怎么 加 群、tg群等内容。Telegram中文群组索引为广大电报用户提供各种电报群组/电报频道/电报机器人导航服务。

Penang infrastructure and transport exco Zairil Khir Johari says as of August 8, more than 40 local and international companies have registered for pre-qualification to be awarded the Bayan Lepas LRT project contract. – The Malaysian Insight file pic, August 11, 2022.

THE Penang government has extended the pre-qualification stage of the Bayan Lepas Light Rail Transit (LRT) project until October 7 to allow more companies to register. 

State Infrastructure and Transport Committee Chairman Zairil Khir Johari said the pre-qualification stage of the project has received a good response from local and international companies. 

According to him, the Penang government has also received requests from more than 10 companies, including several international firms from Europe and Asia, that specialise in the construction of railways, to extend the period for submission of pre-qualification documents. 

“The extension of this period is to give them more time to prepare the necessary documents such as a letter of support from the bank and form a joint venture with a local company. 

,

三公大吃小棋牌游戏www.eth108.vip)(三公开船)是用以太坊区块高度哈希值开奖的棋牌游戏,有别于传统三公大吃小棋牌游戏(三公开船)棋牌游戏,三公大吃小棋牌游戏(三公开船)游戏绝对公平,结果绝对无法预测。三公大吃小棋牌游戏(三公开船)由玩家PK,平台不参与。

,

“Thus, the Penang government has agreed to extend the pre-qualification period from August 24 to October 7, 2022,” he said in a statement today. 

Zairil said that as of August 8, over 40 local and international companies had registered, purchased and downloaded pre-qualification documents from the Penang Infrastructure Corporation website. 

He said interested companies are required to submit their pre-qualification documents by no later than 12pm on October 7. 

The state government’s target is to start the construction of the LRT line that connects Komtar and Bayan Lepas next year. – Bernama, August 11, 2022.


转载说明:本文转载自Sunbet。 环球UG声明:该文看法仅代表作者自己,与本平台无关。转载请注明:Telegram中文群组索引:Penang govt extends pre-qualification period for LRT project till Oct 7
发布评论

分享到:

手机新2管理端(www.hg108.vip):Sarawak PKR calls for religious university to accept all faiths
你是第一个吃螃蟹的人
发表评论

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。